Link Details
URL | https://forcetecgroup.com/ |
---|---|
Description | Forepoling with pipe umbrella system is a pre-support measure that is employed in tunneling works in weak ground conditions to sustain loose formations, secure the upper arch and avoid roof collapses. This is achieved by drilling steel tube micropiles sub-horizontally to the contour of the tunnel section in the shape of an umbrella. Pipe umbrella system increases the stability by transferring loads in the longitudinal direction and reduce deformations due to excavations. |
Owner | |
Add Time | 2021-06-30 16:43:47 |
Category | Business / MiningandDrilling |
About
This is a public Link Share Directory.
Recent Links
-
1win_md_faOl
2025-05-13 15:10:57 -
1win_rwSa
2025-05-13 14:58:37 -
1win_cpsn
2025-05-13 14:36:31 -
1win_md_slOl
2025-05-13 14:00:04 -
1win_yuMl
2025-05-13 13:54:11 -
1win_md_izki
2025-05-13 13:46:07 -
1win_zuMl
2025-05-13 13:31:44 -
1win_prOi
2025-05-13 13:17:38 -
1win_md_zaOl
2025-05-13 13:15:56 -
1win_agMl
2025-05-13 12:48:27